The August 5, 2022 proposed-author-amendment attachment was not recovered. This pass tested California State Archives public discovery, rather than repeating the FARA filing index. The Archives describes committee bill files containing…
Research packet for root integration; captured September 8, 2026 in America/Chicago (some receipt timestamps are September 9 UTC). This is a bounded historical acquisition, not a statement about the Act's present enforceability.…
Root announcement/current-status lane closed,9September2026. The Commission's18June2025 announcement (updated20June2025) describes legally binding AliExpress commitments on researcher access to public data: automated access/scraping, a…
Closed and root-reviewed 9 September 2026. This bounded lane the Commission audit index and the linked AliExpress 2024/25 audit and implementation report. It inspected the public-data access obligation, selected audit…
Research cutoff: 9 September 2026. No historical textual delta was established by this lane. The official version selector and bill history were verified, and the enacted baseline was already read in full. The attempted…
9 September 2026. Root read all18 pages of the independently published 18 March2025 Assembly Privacy and Consumer Protection analysis(httplocal research file This describes the introduced bill and proposed amendments; it is not the…
9September2026. Root acquisition CLOSED at the recipient marketplace/rule breakpoint. This packet connects documented sources of pressure and offered integrations without treating every list as a court finding or every available control…
Research breakpoint observed 9 September 2026. This is a source-bounded synthesis of the completed first Red Lines wave. The user subsequently authorised unattended continuation; the follow-through lanes remain separate until reviewed.…
Bounded acquisition closed, 9 September 2026. One new substantive primary original was and read. Two final deliverables were located through the official results index but their download service returned technical errors. No dataset,…
Bounded instrument lane closed, 9 September 2026. Two directly associated official PDF originals acquired: the public version of the adopted decision with its commitment annex, and the Commission's monitoring-trustee notice. No live…
Closed 9 September 2026. This lane sought the actual approved mandate, the first monitoring trustee report due in November 2025, or a Commission response, including researcher-access results and evidence sharing with the Article 37…
Observed 9 September 2026. This is a bounded static inspection of the public implementation linked by Tech Against Terrorism (TAT), not an installed or deployed system test. Acquisition is closed. No product/API calls, accounts, forms,…
Observed 9 September 2026. Scope: Fathom public strategy, workshop reports and evaluation-industry interviews. The California instrument is separately assessed in fathom-bill.md.
Instrument reviewed: Online Safety Amendment (Digital Duty of Care) Bill 2026, exposure draft dated 8 September 2026. Research date: 9 September 2026. This is proposed legislation, not an enacted duty. The preceding whole-case…
The missing public board sequence is now acquired. It documents responses, some changed procedures and limits. It also identifies a consequential boundary: Corby's declared exclusion covered testing and euCONSENT submission, while July…
Observed 9 September 2026. Bounded lineage run after the recorded assurance forest review. Draft legal operation and access are separate companion notes.
Bounded acquisition, 9 September 2026. The 8 September 2026 exposure draft is a proposal, not an enacted or operating duty. This note follows the funding/governance forest assessment and reads the existing policy-lineage,…